Peace River Cumulative Impact Study (CIS) Final Report
Please note: All files are large and may take a
substantial time to download! |
Full Report (Very Large File - 360 MB)
Chapter 1 - Introduction
Chapter 2 - Stressors and Indicators in the Watershed
Chapter 3 - Peace River Basins
- 3.1
Watershed Setting
- 3.2 Peace River at Bartow
- 3.3 Peace River at Zolfo Springs
- 3.4 Payne Creek
- 3.5 Charlie Creek
- 3.6 Peace River at Arcadia
- 3.7 Joshua Creek
- 3.8 Horse Creek
- 3.9 Shell Creek
- 3.10 Coastal Lower Peace River
Chapter 4 - Cumulative Impacts to the Peace River Watershed
- 4.1 Hydrology
- 4.2 Water Quality
- 4.3 Natural Systems and Land Use
- 4.3.1 Land Use Changes: 1940s - 1999
- 4.3.2 Changes in Land Use: 1940s - 1979
- 4.3.3 Changes in Land Use: 1979 - 1999
Chapter 5 - Overview of History and Evaluation of Regulatory
Effectiveness
Appendices
- A Literature Review
- B Hydrologic and Water Quality Data
- C Arc/GIS Project File
- D
Analyses of Long-term Trends and Changes in Hydrology
- E
Analysis of Long-term Changes and Trends in Water Quality in
the Peace River Watershed / Lower Peace River / Upper Charlotte
Harbor Estuary
- F Development of the 1940s Baseline / GIS Land Use Layer
- G Change Analyses of Historic Land Use / Acreage Calculations
for Each Basin
- H Basin Water Budgets and Watershed Conceptual Models
- I Regulatory History and Effectiveness
- J Fishes in the Peace River Watershed
Map Portfolio
(37.3 Mb)
Mining and Minerals Regulation Home
2051 E. Paul Dirac Drive (Collins Building) Tallahassee, FL 32310-3760 Phone
(850) 488-8217 Fax (850) 488-1254