Documents are Adobe Acrobat files, which will open in a new window, unless indicated, and require the free Reader Software.
ITN Background Information (90 KB) List of Figures (Download the Figures - 5.3 MB) Figure 1 - Aerial Photograph of Site Figure 2 - Topographic Map of Site Figure 3 - Aerial Photograph (2003 Operation Plan Information) Figure 4 - Basic Closure Plan Figure 5 - Cross Sections A and B Figure 6 - Cross Sections C and D Figure 7 - Cross Sections E-1 and E-2 Figure 8 - Cross Sections F and G Figure 9 - Cross Sections H and I b b b Figure 10 - Cross Sections J and K Figure 11 - Typical Closure Details List of Appendices Appendix 1 Calendar Year 2003 Emergency Operations and Water Management Plan (19.1 MB) Appendix 2 Contingency Plan / Response Procedures (11.6 MB) Appendix 3 Water Year 2003 Water Monitoring Report (3.2 MB) Appendix 4 Process Water Balance Projections (Updated July 7, 2004) (4.1 MB) Appendix 5 Hydrogeologic Study to Quantify Fresh Groundwater Input Into Phosphogypsum Stack System (4.3 MB) Appendix 6 Construction Drawings for Gypsum Stack System Closure Phase I (13.3 MB) Appendix 7 Specifications for Gypsum Stack System Closure Phase I (260 KB) Appendix 8 Construction Drawings for Gypsum Stack System Closure Phase II 12.4 MB) Appendix 9 Specifications for Gypsum Stack System Closure Phase II (298 KB) Appendix 10 Typical Technical Specifications for Gypsum Stack Side Slope and Top Gradient Closure Construction (89 KB) Appendix 11 Construction Drawings for North Cooling Pond Conversion for Lime Sludge Disposal (6.7 MB) Appendix 12 Process Water Management Fact Sheet (239 KB) Appendix 13 July 7, 2004 FDEP Piney Point Status Update (194 KB) Piney Point Questions and Answers Support Documentation Discharge Report Double Lime Flow and NH3 Electrical Cost History EXPENDITURES at Piney Point Groundwater Summary Report (1.8 MB) ITN Mandatory Site Visit Combined Presentations, August 5, 2004 (3.2 MB) Lime Station Costs Outfall 003 (196 KB) Piney Point Gypsum Properties Piney Point Rainfall Data Receiver Court Report (115 KB) RO-USFilter Spray Evaporation System Drawings (2.6 MB) Summary of NGS-S and OGS Lump Sum Costs Water Balance Dated August 20 2004 (4.3 MB) Weekly Water Report (220 KB)
Figure 1 - Aerial Photograph of Site Figure 2 - Topographic Map of Site Figure 3 - Aerial Photograph (2003 Operation Plan Information) Figure 4 - Basic Closure Plan Figure 5 - Cross Sections A and B Figure 6 - Cross Sections C and D Figure 7 - Cross Sections E-1 and E-2 Figure 8 - Cross Sections F and G Figure 9 - Cross Sections H and I b b b Figure 10 - Cross Sections J and K Figure 11 - Typical Closure Details
Discharge Report Double Lime Flow and NH3 Electrical Cost History EXPENDITURES at Piney Point Groundwater Summary Report (1.8 MB) ITN Mandatory Site Visit Combined Presentations, August 5, 2004 (3.2 MB) Lime Station Costs Outfall 003 (196 KB) Piney Point Gypsum Properties Piney Point Rainfall Data Receiver Court Report (115 KB) RO-USFilter Spray Evaporation System Drawings (2.6 MB) Summary of NGS-S and OGS Lump Sum Costs Water Balance Dated August 20 2004 (4.3 MB) Weekly Water Report (220 KB)
Mining and Minerals Regulation Home 2051 E. Paul Dirac Drive (Collins Building) Tallahassee, FL 32310-3760 Phone (850) 488-8217 Fax (850) 488-1254
Last updated: September 21, 2011