| Suwannee—Water Quality Assessment Report |
| Entire Report |
Entire report has been optimized for small file size. For more clearly rendered maps you may download figures individually from the list below. |
Download PDF (8.3M) |
| Suwannee—Download Maps |
| Fig. 1.1 |
Schedule for Implementing the Watershed Management Cycle in the Departments Northeast District, Basin Groups 1 through 5 |
Download PDF (520K) |
| Fig. 2.1 |
Geopolitical Map of the Suwannee Basin |
Download PDF (548K) |
| Fig. 2.2 |
Surface Water Resources of the Suwannee Basin |
Download PDF (584K) |
| Fig. 3.1 |
Locations and Boundaries of Planning Units in the Suwannee Basin |
Download PDF (628K) |
| Fig. 3.2 |
Composite Map of the Upper Suwannee, Alapaha, and Withlacoochee Planning Units, Including the 1998 303(d) List, Planning List, and Verified List Waters |
Download PDF (1.9M) |
| Fig. 3.3 |
Composite Map of the Middle Suwannee Planning Unit, Including the 1998 303(d) List, Planning List, and Verified List Waters |
Download PDF (3M) |
| Fig. 3.4 |
Composite Map of the Lower Suwannee Planning Unit, Including the 1998 303(d) List, Planning List, and Verified List Waters |
Download PDF (1.9M) |
| Fig. 3.5 |
Composite Map of the Santa Fe Planning Unit, Including the 1998 303(d) List, Planning List, and Verified List Waters |
Download PDF (2.9M) |
| Fig. 3.6 |
Composite Map of the Waccasassa Planning Unit, Including the 1998 303(d) List, Planning List, and Verified List Waters |
Download PDF (1.9M) |
| Fig. 3.7 |
Composite Map of the Aucilla/Wacissa, Econfina, Fenholloway, Steinhatchee, and Other Coastal Basins Planning Units, Including the 1998 303(d) List, Planning List, and Verified List Waters |
Download PDF (3.1M) |
| Fig. 4.1 |
Waters on the Verified List by TMDL Priority, with Projected Year for TMDL Development |
Download PDF (4.3M) |
| Fig. 5.1 |
TMDL Priority Area for 2002Fenholloway River Planning Unit |
Download PDF (168K) |