| St. Lucie and LoxahatcheeWater Quality Assessment Report |
Entire
Report |
Entire report has been optimized for small file size. For more clearly rendered maps you may download figures individually from the list below. |
Download PDF (10.1M) |
| St. Lucie and Loxahatchee Water Quality Assessment ReportMaps |
| Fig. 1.1 |
Schedule for Implementing the Watershed Management Cycle in the Department’s Southeast District, Basin Groups 1 through 5 |
Download PDF (272K) |
| Fig. 2.1 |
Geopolitical Map of the St. Lucie and Loxahatchee Basins |
Download PDF (440K) |
| Fig. 2.2 |
Surface Water Resources of the St. Lucie and Loxahatchee Basins |
Download PDF (1M) |
| Fig. 3.2 |
Locations and Boundaries of Planning Units in the St. Lucie and Loxahatchee Basins |
Download PDF (276K) |
| Fig. 3.3 |
Composite Map of the C-25/Basin 1 Planning Unit, Including the 1998 303(d) List, Planning List and Verified List Waters, Potential Pollution Sources, and CERP Projects |
Download PDF (544K) |
| Fig. 3.4 |
Composite Map of the North St. Lucie Planning Unit, Including the 1998 303(d) List, Planning List and Verified List Waters, Potential Pollution Sources, and CERP Projects |
Download PDF (576K) |
| Fig. 3.5 |
Composite Map of the C-24 Planning Unit, Including the 1998 303(d) List, Planning List and Verified List Waters, Potential Pollution Sources, and CERP Projects |
Download PDF (548K) |
| Fig. 3.6 |
Composite Map of the C-23 Planning Unit, Including the 1998 303(d) List, Planning List and Verified List Waters, Potential Pollution Sources, and CERP Projects |
Download PDF (500K) |
| Fig. 3.7 |
Composite Map of the South St. Lucie Planning Unit, Including the 1998 303(d) List, Planning List and Verified List Waters, Potential Pollution Sources, and CERP Projects |
Download PDF (512K) |
| Fig. 3.8 |
Composite Map of the C-44 Planning Unit, Including the 1998 303(d) List, Planning List and Verified List Waters, Potential Pollution Sources, and CERP Projects |
Download PDF (412K) |
| Fig. 3.9 |
Composite Map of the Loxahatchee Planning Unit, Including the 1998 303(d) List, Planning List and Verified List Waters, Potential Pollution Sources, and CERP Projects |
Download PDF (524K) |
| Fig. 3.10 |
Composite Map of the Coastal Planning Unit, Northern Portion, Including the 1998 303(d) List, Planning List and Verified List Waters, Potential Pollution Sources, and CERP Projects |
Download PDF (524K) |
| Fig. 3.11 |
Composite Map of the Coastal Planning Unit, Southern Portion, Including the 1998 303(d) List, Planning List and Verified List Waters, Potential Pollution Sources, and CERP Projects |
Download PDF (528K) |
| Fig. 4.1 |
Waters on the Verified List, with Projected Year for TMDL Development |
Download PDF (488K) |
| Fig. 5.1 |
St. Lucie and Loxahatchee Basins Priority TMDL Priority Watersheds for 2003 |
Download PDF (136K) |