| Lake Worth LagoonPalm Beach Coast Water Quality Assessment Report |
| Entire Report |
Entire report has been optimized for small file size. For more clearly rendered maps you may download figures individually from the list below. |
Download PDF (11M) |
| Lake Worth LagoonPalm Beach Coast Water Quality Assessment ReportMaps |
| Fig. 1.1 |
Schedule for Implementing the Watershed Management Cycle in the Department’s Southeast District, Basin Groups 1 through 5 |
Download PDF (292K) |
| Fig. 2.1 |
Geopolitical Map of the Lake Worth LagoonPalm Beach Coast Basin |
Download PDF (760K) |
| Fig. 2.2 |
Surface Water Resources of the Lake Worth LagoonPalm Beach Coast Basin |
Download PDF (532K) |
| Fig. 2.3 |
Enlarged Map of the Lake Worth Lagoon and Coastal Region |
Download PDF (396K) |
| Fig. 3.2 |
Locations and Boundaries of Planning Units in the Lake Worth LagoonPalm Beach Coast Basin |
Download PDF (636K) |
| Fig. 3.3 |
Composite Map of the L-8 Planning Unit, Including the 1998 303(d) List, Planning List and Verified List Waters, and Potential Pollution Sources |
Download PDF (272K) |
| Fig. 3.4 |
Composite Map of the C-51 Planning Unit, Including the 1998 303(d) List, Planning List and Verified List Waters, and Potential Pollution Sources |
Download PDF (496K) |
| Fig. 3.5 |
Composite Map of the C-17 and West Palm Beach Water Catchment Planning Units, Including the 1998 303(d) List, Planning List and Verified List Waters, and Potential Pollution Sources |
Download PDF (424K) |
| Fig. 3.6 |
Composite Map of the C-15, C-16, and C-16 North Planning Units, Including the 1998 303(d) List, Planning List and Verified List Waters, and Potential Pollution Sources |
Download PDF (432K) |
| Fig. 3.7 |
Composite Map of the Hillsboro Canal Planning Unit, Including the 1998 303(d) List, Planning List and Verified List Waters, and Potential Pollution Sources |
Download PDF (376K) |
| Fig. 3.8 |
Composite Map of the Northern Portion of the Intracoastal Planning Unit, Including the 1998 303(d) List, Planning List and Verified List Waters, and Potential Pollution Sources |
Download PDF (632K) |
| Fig. 3.9 |
Composite Map of the Southern Portion of the Intracoastal Planning Unit, Including the 1998 303(d) List, Planning List and Verified List Waters, and Potential Pollution Sources |
Download PDF (436K) |
| Fig. 4.1 |
Waters on the Verified List, with Projected Year for TMDL Development |
Download PDF (196K) |
| Fig. 5.1 |
Lake Worth LagoonPalm Beach Coast Basin Priority TMDL Priority Watersheds for 2005 |
Download PDF (352K) |