Collection System Permitting
A Short Course
In Collection/Transmission System Permitting
or " How to
guarantee approval to start construction of your project
within 30 days of
submittal of the form and fee"
If you designed your system in accordance
with all of the guidelines, use the
General Permit by marking your
intention on the new form.
Form Hints
-
Send a sketch, as described on the form, not a set of drawings.
-
Fill out all of the blanks with the
engineer's initials, or an "X".
-
Give a short explanation of any "X"s.
-
Get all the required signatures.
Separations diagram-- required distances from
Public Water Mains
If you'd like more information,
View a PowerPoint presentation with details on collection system permitting.
updated 10 2011
Guidelines for permitting a low pressure collection system
return to Central District home
Contact
List- Domestic
Wastewater Permitting
Central
District
Domestic
Wastewater Permitting Section
3319 Maguire
Blvd, Suite 232
Orlando,
Florida 32803-3767
Section phone:
407-897-4163
Section Fax:
850 412-0496
If you have technical problems with the functioning of this web site,
please e-mail
our webmaster.
Last updated:
October 19, 2011