|
To
CD Home >SLERP>
David Herbster, Administrator
Docks may
require a permit or authorization from DEP before
you build.
Here's a guide to
Single Family Dock Construction.
Why does DEP care about docks?
- Protect fragile waterways
- State owns the submerged lands on which many docks are built.
Before construction, you may need to obtain a permit
from DEP to build a dock, and authorization from DEP to use
the State's submerged lands.
Docks-
Self-certification process for PRIVATE docks associated with
detached individual single-family homes on the adjacent uplands.
About
Sovereign Submerged Lands Authorizations
return to Central District home
Contact List
Central
District Office
3319 Maguire
Blvd, Suite 232
Orlando,
Florida 32803-3767
SLERP fax: 850-412-0467
If you have technical problems with the functioning of this web site,
please e-mail
our webmaster.
|